Skip to main content

Gold Dust Drive Sidewalk Improvements - Homestead

This project is scheduled to begin on Monday 7/20/26 and conclude on 9/18/26. Please slow down when flaggers are present and use caution in the construction area.

Approximately 4,500 linear feet of sidewalk will be reconstructed to improve safety and walkability by addressing cracking, surface flaking, and uneven areas.

The image shows a topographic map with a winding black path, nearby elevations, and geographical features like Eagle River and roads.